scienceneutral
NASA's Big Lift for Artemis Missions
Stennis Space Center, Hancock County, USASaturday, October 26, 2024
NASA is preparing for the next big Moon mission, Artemis IV. This mission will send four astronauts to the Lunar Gateway, a space station near the Moon. After that, they'll head down to the Moon's surface using SpaceX's Starship lander. The interstage simulator section will be crucial for these missions as it supports the rocket's new Exploration Upper Stage (EUS).
The EUS is a powerful part that can carry more cargo than the previous version. It will support up to 38 tons of crew and cargo, or 42 tons without a crew. This is a significant improvement from the current 27 tons capacity. Four RL10 engines will power this new stage, making it ready for the intense journey to the Moon.
The interstage simulator section is a whopping 31 feet in diameter and 33 feet tall. Its top part will absorb the thrust from the engines and transfer it back to the test stand. This way, the stand won't get damaged by the engines' powerful force. NASA's testing will ensure that the SLS rocket is ready for the exciting Artemis IV mission.
Actions
flag content